PERMIT
ISSUANCE
|
|
1. |
For
the issuance of a permit.
|
$20.00 |
|
2. |
For
issuing each supplemental permit.
|
$6.00 |
|
|
UNIT
FEE SCHEDULE |
|
1. |
For
the installation or relocation of each forced-air or gravity-type
furnace including ducts and vents attached to such appliance,
up to and including 100,000 Btu/h. |
$12.00 |
|
2. |
For
the installation or relocation of each forced-air or gravity-type
furnace including ducts and vents attached to such appliance,
over 100,000 Btu/h. |
$15.00 |
|
3. |
For
the installation or relocation of each floor furnace, including
vent. |
$12.00 |
|
4. |
For
the installation or relocation of each suspended heater, recessed
wall heater or floor mounted unit heater. |
$12.00 |
|
5. |
For
the installation, relocation or replacement of each appliance
vent installed and not part of an appliance permit. |
$6.00 |
|
6. |
For
the repair of, alteration of, or addition to each heating, appliance,
refrigeration unit, cooling unit, absorption unit, or each heating,
cooling, absorption, evaporative cooling system, including installation
of controls regulated by the Mechanical Code. |
$12.00 |
|
7. |
For
the installation or relocation of each boiler or compressor to
and including 3 horsepower or each absorption system to and including
100.000 Btu/h. |
$12.00 |
|
8. |
For
the installation or relocation of each boiler or compressor over
3 horsepower to and including 15 horsepower, or each absorption
system over 100,000 Btu/h and including 500,000 Btu/h. |
$22.00 |
|
9. |
For
the installation or relocation of each boiler or compressor over
15 horsepower to and including 30 horsepower, or each absorption
system over 500,000 Btu/h and including 1,000,000 Btu/h. |
$30.00 |
|
10 |
For
the installation or relocation of each boiler or compressor over
30 horsepower to and including 50 horsepower, or each absorption
system over 1,000,000 Btu/h and including 1,760,000 Btu/h. |
$45.00 |
|
11. |
For
the installation or relocation of each boiler or refrigeration
compressor over 50 horsepower, or each absorption system over
1,760,000 Btu/h. |
$75.00 |
|
12. |
For
each air handling unit to and including 10,000 cfm, including
ducts. |
$9.00 |
|
13. |
For
each air handling unit over 10,000 cfm. |
$15.00 |
|
14. |
For
each evaporative cooler other than portable. |
$9.00 |
|
15. |
For
each ventilation fan connected to a single duct. |
$9.00 |
|
16. |
For
each ventilation system which is not a portion of any heating
or air conditioning system authorized by a permit. |
$4.50 |
|
17. |
For
the installation of each hood that is served by a mechanical
exhaust, including ducts |
$9.00 |
|
18. |
For
the installation of each residential type incinerator. |
$15.00 |
|
19. |
For
the installation of each commercial or industrial incinerator. |
$60.00 |
|
20. |
For
each appliance or piece of equipment regulated by the Mechanical
Code, but not classed in other appliance categories. |
$9.00 |
|
21. |
Fuel-gas
piping shall be as follows:
For
each gas-piping system of one to four outlets.
For
each additional outlet. |
$4.00