City Project Engineer, Erik Wahrgren, P.E. 503.496.1510 or ewahrgren@orcity.org
Consulting Engineer, Ron Wiegel, P.E. Century West Engineering Corp. 503.419.2136 or rweigel@centurywest.com
June 15, 2010: Addendum 1 was issued on June 10, 2010.
June 17, 2010: Bids were opened at 2:00 p.m. Five bids were received with the apparent low bid submitted by Whitbey Construction. The tentative bid results are as follows:
|
Bidder |
Bid Amount |
| Whitbey Construction | $117,796.00 |
| Brix Paving Company | $132,216.00 |
| Colton Homes | $146,000.00 |
| Matton Utility | $174,976.88 |
| GVS Contracting | $229,890.00 |

The project is currently out for bid. Bids are due no later than 2:00 PM local time on June 17, 2010. Construction includes:
1. Construction of approximately 264 linear feet of curb and sidewalk
2. Excavation of unsuitable material and backfill with CDF beneath all curbs
3. Removal and replacement of approximately 291 feet of 10-inch PVC storm drain along with approximately 60 feet of 8-inch PVC laterals
4. Milling approximately 700 square yards of asphalt concrete 2-inches thick and replacement with new asphalt concrete
5. Removal and replacement of one storm drain inlet