  • Main Street Storm Sewer Improvement Project (CI 10-007)

  • Type

  • Stormwater/Wastewater
  • Status

  • Completed
  • Budget

  • $144,444.00 (Jim Smith Excavating, Inc.)
  • Dates

  • Construction: September 7, 2010
  • Contact:

  • City Project Engineer: Erik Wahrgren, P.E., ewahrgren@orcity.org or 503.496.1510.

    Engineering Consultant: Adam Crafts, P.E., Wallis Engineering PLLC, 360.695.7041.

  • Alerts and Updates

  • September 13, 2010: Work will begin at 8th St. and Main St. to avoid car show

    September 7, 2010: Work will begin at 13th St. and Main St.

    June 4, 2010:  The project is scheduled to advertise in the Portland Daily Journal of Commerce on June 3 and June 7, 2010.  Bids are due no later than 2:00 PM local time on Thursday, June 24, 2010

    June 22, 2010:  Addendum No. 1 was issued.

    June 24, 2010:  Bids were received and opened.  Six bids were received and the apparent bid results are as follows:

    Apparent Bid Results
    Bidder's Name Bid Total
    Jim Smith Excavating, Inc. $144,444.00
    Matton Utility $158,836.85
    D & T Excavation, Inc. $182,709.60
    CivilWorks NW, Inc. $196,405.00
    Dirt & Aggregate $227,787.00
    NW Kodiak Construction $273,274.00

     

  • Project Details

  • Project Site Map

    Utility improvement project in Downtown Oregon City including the installation of 700 linear feet of 15 inch and smaller storm sewer pipe, a pollution control manhole, 5 storm sewer manholes, 4 concrete inlets and other storm improvements; the construction of 100 linear feet of curb, 530 square feet of sidewalk and ramps, and 400 square yards of asphaltic concrete; the construction of 2, cured-in-place point repairs on existng storm sewer pipe; and other work as required.