City Project Engineer: Erik Wahrgren, P.E., ewahrgren@orcity.org or 503.496.1510.
Engineering Consultant: Adam Crafts, P.E., Wallis Engineering PLLC, 360.695.7041.
September 13, 2010: Work will begin at 8th St. and Main St. to avoid car show
September 7, 2010: Work will begin at 13th St. and Main St.
June 4, 2010: The project is scheduled to advertise in the Portland Daily Journal of Commerce on June 3 and June 7, 2010. Bids are due no later than 2:00 PM local time on Thursday, June 24, 2010.
June 22, 2010: Addendum No. 1 was issued.
June 24, 2010: Bids were received and opened. Six bids were received and the apparent bid results are as follows:
| Bidder's Name | Bid Total |
| Jim Smith Excavating, Inc. | $144,444.00 |
| Matton Utility | $158,836.85 |
| D & T Excavation, Inc. | $182,709.60 |
| CivilWorks NW, Inc. | $196,405.00 |
| Dirt & Aggregate | $227,787.00 |
| NW Kodiak Construction | $273,274.00 |

Utility improvement project in Downtown Oregon City including the installation of 700 linear feet of 15 inch and smaller storm sewer pipe, a pollution control manhole, 5 storm sewer manholes, 4 concrete inlets and other storm improvements; the construction of 100 linear feet of curb, 530 square feet of sidewalk and ramps, and 400 square yards of asphaltic concrete; the construction of 2, cured-in-place point repairs on existng storm sewer pipe; and other work as required.