  • Railroad Crossing Safety Improvements (10th Street Crossing)

  • Type

  • Transportation
  • Status

  • Under Construction
  • Budget

  • Construction: $41,665 (Tice Electric Co.)
  • Dates

  • Beginning of Construction: September 13, 2010
  • Contact:

  • Project Manager/Erosion Control Officer: John Burrell jburrell@orcity.org or 503.496.1556.

  • Alerts and Updates

  • November 17, 2011:  Bids were received to make repairs to make repairs to the crossing following a vehicle/train incident as well as to install one additional detection loop.  Prairie Electric, Inc. was the low bidder. 

    May 6, 2010:  Bids were received, and the low bid was submitted by Tice Electric Co. from Portland Oregon.

  • Project Details

  • Railroad Crossing Safety Improvements (10th Street Crossing)

    The work includes the installation of traffic control devices including electric signs, static signs, loop detectors, poles, cabinets and wiring required to notify the public "DO NOT STOP ON TRACKS" at the Singer Hill railroad crossing.