Street (Transportation) Division

Program Objective
Maintain the City’s transportation system and improve public safety. Implement best management practices while performing operations to protect the surrounding environment.
Wish to Report a Pothole?
Kevin Hanks, Operations Street Supervisor
503.657.8241, e-mail
Crew:
Matt Powlison, Utility Maintenance Team Leader e-mail
Gabe Camacho
Jayson Thornberg
Wes Wilson
Si Norris
Jan Holmgren
System Details
-
2009/10 Operations budget = $1.3 Million
-
Pavement Maintenance Utility Fee (PMUF)
-
2009/10 PMUF budget = $700,000
-
Municipal Elevator
-
Miles of Streets:
-
136 miles City
-
13.5 miles County
-
12.5 State (OR 99E and 213)
-
49 signalized intersections
-
Local, neighborhood collector, collector, minor and major arterial classifications
Key Programs
-
Pavement Maintenance

-
Signage and pavement markings
-
Street lighting and signal maintenance
-
Routine roadside maintenance
-
Snow and ice response
-
Emergency response
-
City beautification and community involvement
-
Traffic management and safety
-
Transportation Advisory Committee
Traffic Management & Safety
-
Sign maintenance and production
-
Roadside barricade & guard rail installation and repair
-
Inclement weather operations
-
Fall leaf cleanup
-
Spill response & cleanup
-
Work with code enforcement
-
Parking meter installation and replacement
-
Rockfall removal/mud slide response

Public Works (General)
-
Respond to citizen concerns
-
Maintain/clean equipment
-
Facility maintenance
-
Construction inspection and observation
-
Development plan review
-
Public parking lot maintenance
-
Repair graffiti & other street vandalism
-
Safety meetings/training
Pavement Management
Roadside Maintenance
-
Painting curbs, crosswalks, stop bars, etc.
-
Roadside mowing/brush removal
-
Roadside litter
-
Gravel shoulders, grade gravel streets
-
Street sweeping
-
Remove illegally posted signs
-
Install and maintain new trash cans, benches, bicycle racks
-
Remove hazardous trees from the public right-of-way
-
Remove fallen limbs from roadway
City Beautification & Community Involvement
-
Clean steps & paths
-
Graffiti removal
-
Install event banners
-
Barricade installation and removal for parades and events
-
Christmas decorations
-
Install flower pots
-
Empty garbage cans
-
Median and street tree care
-
Coordinate street closures
Street Lighting & Signal Systems
Facts & Figures
|
Detention Tanks |
37 (2 miles) |
|
City Roads |
128 miles |
|
12 miles (State) |
|
8 miles (County) |
|
Sidewalks |
135 miles |
|
Right-of-Way Area |
1,125 miles |